FABULOUS SAFETY®

HOME>News>Company Dynamic>Company Dynamic

Heatstroke Prevention Work is Ready

2016-07-13 08:20 | writer: admin

Nowadays the temperature outside has raised  from 26° to 35° after several days raining. We all changed to summer clothing.
 
People who has been to the workshop should know that the production machine will release a large amount of heat in the processing of produce, so the temperature inside the workshop will be higher 4°-5°than the outdoor. In order to ensure the safety and health of workers on the production line in the company, we recently launched a summer cooling work.
 
Our technical staff check and maintain all the power distribution equipment and  cooling system of the workshop area and rest room.  A “heatstroke prevention group ”has been set up in the workshop. They put “ wind blows” as a priority, so that the workers who feel not comfortable can be sent to the clinic to take effective treatment at the first time. The infirmary already prepared some heatstroke drugs like Huoxiang Zhengqi Liquid, Glucose liquid and Rendan mini-pills. In order to make sure that work staff can timely supplement drinking water, the primary area of the workshop placed some soft drinks like herbal tea , mung bean soup, which can clearing heat and purging fire.
 
Our company combined the Heatstroke prevention work together with the summer safety inspection work. To "create a comfortable working environment for every member to ensure their safety and health " as a precondition, we will carry  green production and humanistic care of business ideas through to the end.
 


Recommended Products

Contact Form Go Top

Fill in your email address, get our catalog and a fine gift.

x